§ 13.08.390. Two-way cleanout required—Reduction in size of building sewer.  


Latest version.
  • Existing five-inch diameter building sewer may be reduced to four-inch diameter pipe when building sewer replacement occurs downstream and a new connection is made to the sanitary sewer main. A two-way cleanout shall be constructed between the dissimilar pipes to the specifications and standards of the city (unless this requirement is waived by the Director of Public Works or his or her authorized representative). This requirement is in addition to any other requirement for two-way cleanouts specified in this code. No two-way cleanout is required when there is an enlargement of pipe downstream for the existing building sewer.

(Prior code § 6-6.243)