§ 5.19.060. Permit required for UDCBs.  


Latest version.
  • A.

    With the exception of UDCBs described in Subsection B, below, it is unlawful to place, operate, maintain or allow a UDCB on any real property unless the parcel owner/agent and/or operator first obtain an annually renewable UDCB permit from the City. A separate UDCB permit is required for each UDCB unless a second UDCB is required for overflow items per Subsection 5.19.120(H), in which case the permit for the first UDCB can include the second UDCB on a parcel.

    B.

    UDCBs that are either enclosed within a principal building or are accessory to a principal activity on a property owned or leased by the bin operator shall not require a UDCB permit. However, UDCBs that are accessory to a principal activity on a property owned or leased by the bin operator shall meet all other requirements of this chapter except the requirements contained in Subsection 5.19.120(A), (B) and/or (C).

    C.

    The UDCB permit applicant shall be the UDCB operator and the permit may not be transferred, conveyed or otherwise assigned to another person or entity.

    D.

    Decisions regarding UDCB permit applications shall be made by the Director and the Director shall be considered the investigating official acting for the City Administrator.

(Ord. No. 13335, § 2(Exh. A), 10-20-2015)